The system is seamlessly integrated with the treatment and resource utilization systems to offer customers an integrated kitchen waste collection and treatment service, addressing the problem of kitchen waste collection from the source.
Harmless treatment, where the biodiesel is delivered back to the collection vehicles as fuel, the biogas is used for power generation and for hydroponics, thereby realizing full resource utilization of the by-products of kitchen waste treatment and completely addressing the problem of by-product outlets.
Most powerful brain for collection and transportation – Grandblue Kitchen Waste Intelligent Collection and Transportation System
Automatic generation of optimized routes for complicated scenarios.
On-demand dynamic and rapid adjustment of collection and transportation tasks, with no manual planning.
APP message push, enabling the personnel in charge of the collection point to prepare prior to the arrival of the vehicle and cooperate with the collection.
In case of vehicle fault, the collection and transportation driver can report it through the vehicle system with the press of a button.
In case of collection fault, the collection personnel can record and report it with the press of a button through the handheld device.
In case of improper driving behavior such as speeding, the duty officer of the central control system can instantly identify and stop such behavior.
Reports and graphical presentation of fuel consumption data.
Reports and graphical presentation of the amount of waste collected.
Scientific statistics and assessment of the driving behavior and collection efficiency of collection drivers.
Supervision analysis by government regulators based on changes in various data.
Facilitate and encourage public monitoring and common concern for waste separation and food safety.
Project Cases
Project scale: 500 tons/dayCommissioning date: May 2015Treatment process: Pretreatment + medium-temperature two-phase wet anaerobic + biogas desulfurization and grid-connected power generation + waste oil extraction for biodiesel + remote intelligent operation monitoring.The Nanhai Project built a food waste pre-treatment line and put it into continuous test operation in January 2020 with a capacity of 15 tons/hour.